Accordingly, the 25R/07L runway and E1, NS1, W4 and W6 taxiways will be closed until the end of this year for the first phase of the maintenance project. The 25L/07R runway will be used during the closure.
Tan Son Nhat airport’s runway to be closed for maintenance (Cre: Internet).
Under the project, two rapid-exit and one parallel taxiway will be built, while six current sections will be improved.
The project will be carried out at a cost of over VND2.01 trillion (US$86.7 million), according to the Ministry of Transport.
The Tan Son Nhat Airport has been asked to join hands with relevant agencies to ensure security, safety and operations at the airport during the implementation of the project and inform airlines of the closure of the 25R/07L runway.
Cre: VOV
Nguyen Mai Huong-COMM